fbpx

Nordecon has started the construction of Kalaranna Quarter

8 января, 2020


In January 2020, construction for the first two phases of the Kalaranna Quarter started. The construction works will be carried out by Nordecon.

Kalaranna Quarter, located at Kalaranna 8, will have twelve four and five storey buildings on nearly six hectares. The area will be developed in three stages. An integral part of the residential quarter is a well-thought-out landscape architecture and a beach promenade that largely preserves the existing natural environment. During the first two phases of construction, eight buildings will be completed with 240 apartments, commercial premises and an underground car park. The area will include the Kalaranna Park with versatile leisure opportunities and a Square of almost the size of the Town Hall Square. The first buildings of the two construction phases will be completed by September 2021 at the latest.

The architects of Kalaranna Quarter are Mihkel Tüür and Ott Kadarik (Kadarik Tüür Architects), landscape architects are Maarja Tüür and Kerttu Kõll. Home interior design packages have been created in cooperation with interior architect Galina Burnakova.

The sale of Kalaranna Quarter homes has started and plans for the apartments can be found here: https://kalaranna8.com. Commercial premises are planned on the ground floors of the buildings, plans of which can be found at https://kalaranna8.com/aripinnad/.